Load history decimation

In: Load history decomposition


The user can set by this option, which every value of the load history will be evaluated in the fatigue computation.

Example: Setting the value 3 for this option means that the first value in the load history is accepted, but the next one used in the computation is the fourth value (1+3) of the original sequence.

No real change will be induced in the original load history, which stays preserved.

A well-used value can significantly reduce the computation time. On the other hand, an improper use of this option can omit important points in the load history, which usually would shift the prediction to a non-conservative side.


More:

Calculation Methods menu

© PragTic, 2007

This help file has been generated by the freeware version of HelpNDoc